Previous Module
EVs & Charging

Rail Network Capacity

Optimize rail system capacity through advanced technology, automation, and smart infrastructure design for maximum efficiency and passenger throughput

Rail Network Capacity Optimizer

Design and optimize your rail network capacity. Adjust track length, train frequency, automation levels, and platform configurations to maximize passenger throughput.

Network Capacity Analysis

8,000
Passengers/Hour
10,560
Effective Capacity
95%
Utilization Rate
Base Capacity8,000
Automation Boost (semi)+1,600
Platform Efficiency (double)+960
Total Effective Capacity10,560
$250M
Infrastructure Cost
$9M
Rolling Stock Cost
$5000K
Annual Operating Cost

Technology Impact on Capacity

Automation Benefits:
• Reduced headway times (2-3 minutes)
• Consistent scheduling and performance
• Real-time optimization
• Predictive maintenance
Platform Configuration:
• Faster boarding/alighting
• Reduced dwell times
• Improved passenger flow
• Better accessibility

Performance Projections

Daily Capacity
128,000
passengers per day
Annual Capacity
38.4M
passengers per year
Capacity Planning Insights
• Peak hour capacity utilization typically reaches 80-90%
• Off-peak hours can handle 40-60% of peak capacity
• Modern signaling allows 2-3 minute headways between trains
• Platform design affects boarding time by 20-30 seconds per stop
🚄

High-Speed Rail

Dedicated high-speed lines connecting major cities with speeds up to 350 km/h and minimal stops.

• 200-400 km/h operating speeds
• Grade-separated right-of-way
• Limited station stops
🚊

Light Rail Transit

Street-running or dedicated lanes serving urban areas with frequent stops and high capacity.

• 20-50 km/h in urban areas
• Street-level or elevated tracks
• 2-5 minute headways
🚇

Metro Systems

Underground or elevated heavy rail systems serving dense urban cores with very high capacity.

• 30-80 km/h average speeds
• Underground construction
• 1-3 minute headways

Capacity Enhancement Strategies

Automation & Signaling

Advanced signaling and automated train control

+40%
High Initial2-5 years

Platform Optimization

Island platforms and level boarding

+25%
Medium1-2 years

Frequency Optimization

Optimized scheduling and headway reduction

+30%
Low6-12 months

Rolling Stock Upgrade

Larger trains and better acceleration

+20%
High3-7 years